![]() ![]() ![]() Road width (Blacktop) shall be generally as follows unless specially requested. Roads in the plant shall be planned for the effective movement of trucks, cranes & emergency vehicles, etc.Parking space – 10% of the plot area Roads & Paving considerations in Plant Layout. ![]() Washing – 10-15 liters per day per sq.Cooling tower – 11/4 % of capacity as drift and blowdown losses.Water requirement for Boiler – Steam rating x Working factor.Domestic water – 100 liters per person per day.The area reserved for tree plantation shall be 1/3 of the area occupied.= 1 (Depending upon the regulation governing the area and the type of industry)) Normally Construction is permitted on a maximum of 50% of the plot area with a total built-up area equal to the area of the plot (i.e.Far future expansion Considerations during plant layout.Ministry of Environment and Forest (MoEF) Expansion Philosophy during plant layout development.National Fire Protection Association (NFPA).Static and Mobile Pressure Vessel Rules (SMPV).Central / State Environmental Pollution Control Boards (PCBs).State Industrial Development Corporation (SIDC).Statutory Requirements and process plant layout The requirement of different types of utilities such as Steam, Air, Nitrogen, DM water, Firewater, Brine, etc.Source and/or supply point of raw water.Effluent plant capacity and discharge points, incineration requirements, etc.Raw material receipt and product dispatch philosophy.Intensity and Direction of the wind (wind rose).Minimum, Maximum, and Normal Temperature during the year.Voltage Levels required within the unit.Data to be collected before starting the process of plant layout development Data from the Civil Department Grouping of similar equipment for the convenience of maintenance & safety wherever possible.Operation and Maintenance requirements.The economy of piping material and cables. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |